Facilities

HENDEK SAND GRAVEL PIT

It was established in Sakarya city Hendek district çakallık village local in 2004. The plant 150 tons / hr capacity and 60 health chin, tertiary crusher, 2000x6000 mm, 3-storey 2 sieve, and wash the spiral conveyor belt system is composed of 46 acres has been operating in the licensed area.

GEYVE STONE QUARRY

It was established in Sakarya city Geyve district İhsaniye village local in 2005. The plant 350 tons / hour capacity, and the PDK, tertiary, straight national breakers, 2000x6000 mm 4-storey screen, by passing the line and conveyor belt system, consisting of 200 hectares has been operating within the licensed area.

KIZANLIK STONE QUARRY

It was established in Sakarya city hendek district kızanlık village local in 2007. Plant 250 tons / hour capacity, 110 chin, dmk3, k36 breakers, 2000x6000 mm, 3-story, 2200x6000 mm, 4-story, 1400x5000 mm front screens, by passing the line and conveyor belt system consisting of the 100 hectares licensed within the field is operating.

KARASU STONE QUARRY

It was established in Sakarya city karasu district aziziye ward değirmender local in 2007. Plant 250 tons / hour capacity 100 chin, conical, upright National breakers, 2 x 2000x5000 mm, 4-storey screens, by passing the line, 2 between the hoppers, cyclones washing, dewatering sieve, silt master recycling purification system and the conveyor belt system consisting of the licensed area of 200 hectares, are operating within.